FOR FLAT ROOFS

The roof decides, then the dome.

Domes, flat units and tubular systems for flat roofs — and why the build-up under the waterproofing dictates most of what you order.

THE DEFAULT CASE

What goes into a flat roof

A flat roof is what most of this catalogue is designed for. Three ways to get light in, and the roof usually decides which.

MOST COMMON

Dome rooflight

LK CLASSIC · LK NEO PLUS

A domed unit on an upstand. The widest size range, the most options, and the answer for most flat-roof openings.

  • Sheds water and debris by its shape
  • Clear or Opal glazing
  • Fixed or ventilating

Use it when you are cutting or replacing a standard opening.

Browse rooflights
FLUSH FINISH

Flat rooflight

FDF NEO · FDF NEO PLUS

Flat rather than domed, where the profile of a dome is unwanted or not permitted.

  • Flush sightline from below and above
  • Different drainage detail — check the falls
  • Same upstand requirement

Use it when the architecture calls for a flush finish.

FDF neo
NO OPENING POSSIBLE

Tubular system

SOLATUBE

Where the room needing light is not directly under the roof, or an opening cannot be cut where you want the light.

  • Small roof penetration, large effect
  • Routes through the void
  • No structural opening in the ceiling

Use it when the room is internal, or the ceiling cannot be opened up.

How tubular systems work

THE DETAIL

Why the build-up decides the order

On a flat roof the rooflight is only half the specification. The other half is the upstand, and it is set by the roof rather than by the unit.

The upstand has to lift the glazing clear of standing water, give the membrane a vertical face to turn up and terminate against, carry the insulation line past the opening so the detail is not a cold bridge, and give the unit something to fix to. Which means the height you need is a function of your build-up — deck to finished surface — plus whatever your roofing specification requires above that.

This is the part that gets ordered wrong, and it is why the upstand is chosen before the dome rather than after it.

Specifying in order

  1. 1 Measure the clear opening in the deck, both directions, at both ends.
  2. 2 Measure the build-up depth — deck to finished roof surface, including insulation and waterproofing.
  3. 3 Choose the upstand type: PVC, steel, or thermally broken steel.
  4. 4 Choose the height, from those the type is made in, working from the finished surface up.
  5. 5 Choose the rooflight line and glazing to suit the performance the specification asks for.
  6. 6 Add the frames or opening gear the job needs — and check whether SR or fall-through protection is what is meant.

COMMON JOBS

Where to start, by job

The jobStart here
Replacing a failed dome, kerb stayingRoof dome replacement
New opening in an existing flat roofMeasuring guide, then choosing an upstand
Re-roofing, rooflights coming out and going backChoosing an upstand — the build-up is changing
Upgrading thermal performanceThe range — LK neo plus and FDF neo plus
Internal room, no roof directly aboveSolatube
Opening does not match a listed sizeRequest a quote

Every one of these ends in the same place if you are unsure: send the opening measurements and a photograph.

AVOID

Three flat-roof mistakes

Ordering the dome before the upstand

The heights available change with the upstand type — PVC does 15, 30 and 50 cm, steel does 30, 40 and 50, and the thermally broken version is 50 only. Choosing the unit first can leave you with a height that does not exist for the type you need.

Measuring the build-up from the deck instead of the finished surface

The upstand has to stand proud of the finished roof, not the deck. Insulation and waterproofing come in between, and forgetting them is how an upstand ends up too short to take the membrane properly.

Assuming SR covers fall-through protection

It does not. SR is a weathering frame. Fall-through protection is a separate range — RSM LK, HDS LK, EAD LK and others, depending on the application. If the job needs certified fall-through protection, say so on the enquiry.

Send us the roof.

Opening size, build-up depth and a photograph. We will come back with the upstand, the unit and a price.

Request a quote

Guidance on this page is general. Where your roofing specification differs, follow the specification.